Building Stages

1. Floor framing for this 20'x20' module is made of logs.
Planks are laid for subfloor.

2. Basic post and beam frame is erected
along with loft joists and loft floor.

3. Corner rafters are installed using
temporary center post as construction aid.

4. Basic wall frame is constructed, giving characteristic
shape of PyramoduleTM. All rafters are installed.

5. "Skin" comprised of planks are nailed onto frame and
covered with building paper. Final stage before flashing and shingles are
applied.