| ENTER | INTRO | FLOOR PLANS | TECHNICAL | STAGES | PHOTOS | FAQ | ORDER | CONTACT US |


Building Stages


Building Stages 1

1. Floor framing for this 20'x20' module is made of logs.
Planks are laid for subfloor.


Building Stages 2

2. Basic post and beam frame is erected
along with loft joists and loft floor.


Building Stages 3

3. Corner rafters are installed using
temporary center post as construction aid.


Building Stages 4

4. Basic wall frame is constructed, giving characteristic
shape of PyramoduleTM. All rafters are installed.


Building Stages 5

5. "Skin" comprised of planks are nailed onto frame and covered with building paper. Final stage before flashing and shingles are applied.


Line

Click here to see some samples of PyramodulesTM built by our clients as well as the building stages of our client Gary Jordan who, with his family (wife and two teenage boys), is in the process of building a clustered 20x20 with 16x16 PyramoduleTM Home.

Line

Click here to read about the PyramoduleTM
designer's building experience!


Line